Integrated Armor Systems

11567 Hillguard Rd.
Dallas TX 75243
(214) 221-4469  (214) 221-4108 (Fax)
Email:
sales@integratedarmor.com

 

HARD ASSET PROTECTIVE ENCLOSURES

Self-Contained, Re-Deployable, Protective Enclosures

 

  • • Portable and modular:  Rapid assembly with standard hand and power tools.
  • • Customizable size using standard panel sizes in increments of 18”.
  • • Available in production volumes as of August 2007.
  • APPLICATION: Protects any hard assets --- in any environment.

        

 

Enclosure Testing Summary - Aberdeen Proving Grounds

Test Requirement Result Data
Blast 60 PSI - 117 ms Overpressure PASSED 71 PSI at distance of 12' 8" - Zero structural or visual damage
Ballistic NIJ IV - 7.62 APM2 at 2850 FPS; 12" Spacing PASSED Stopped 5 shots in 4" square at 2900 FPS (See images below)
Fragment Simulated Projectile None PASSED Stopped 20mm FSP at 3800 FPS
Forced Entry 30 Minutes PASSED 52 min to breach door using 4-ton "come along"; unable to breach w / chop saw; unable to penetrate w / hand tools
Fire / Heat Thermal Radiation - Blast; No flame penetration of 2Mw Crib Fire 30 minutes PASSED No flame penetration 1400° F after 30 minutes; 11° F increase at inside wall surface after 30 minutes
Roof Load 14Tn / 300 Ft²  - 4Tn / 100 Ft² PASSED No buckling or damage
Hurricane Force Wind Loads  2 Hrs - Sustained Winds - 75MPH / 100MPH PASSED No structural or visible damage

 

Blast Overpressure Pre and Post Detonation Images (~60 PSI)

 

 

 

Forced Entry Results

Hand tools used by SRT personnel for forced entry.

 

 

The hand tools were used to pry one of the mullions (vertical elements protecting the seams) enough to fit the come-a-long hook. Once one of the mullions was removed, the team moved to the other mullion of the panel. The come-a-long was then used to pry open the one panel. All of the internal clips were broken off and the entire panel was removed. Entry was obtained in approximately 31 minutes. Entry was established when the panel was removed.

 

 

Thermal Assault Test Fire Progression Images

No Flame Penetration / Minimal Internal Temperature Elevation

 

 

 

 

 

 

Roof Load Test Images

 

 

 

Hurricane Force Winds Load Test Images

 

 

CUSTOM GUARD SHACKS

 

_________________________________________________________________________________________________

Please note: When visiting our secure facility, all appointments must be made 24 hours in advance. Also any and all electronic equipment must be kept in the off position.  Visitors will be required to sign in and provide identification. Visitors will not be allowed to enter the facility without an escort. It is unlawful to possess weapons within our secure facility.

 

____________________________________________________________________________________________________

 

 

Proud member of the Better Business Bureau

 

All content ©2010 Integrated Armor Solutions INC

 

IAS is an equal opportunity employer.

____________________________________________________________________________________________________